About park

Project initiator: Government of Kaluga Region represented by the regional Ministry of Economic Development
Location: within city limits on the south border of Kaluga, north of the Kaluga-Kozelsk-Tula intersection along the R-132 motorway. Distance to M-3 highway – 16 km
Land category: industrial

Residents

The industrial park currently accommodates 13 investment projects.

Seven companies operating:

  • Automobile Motor Company  – truck manufacturer.
  • Maco Door&Window Hardware (Austria) – manufacturer of fixtures for plastic windows. Opening ceremony – 27.05.2010.
    Success Story of the company
  • Mercator Kaluga LLC (Russia/Italy) – manufacturer of detachable equipment and special machinery. Opening ceremony – 29.05.2014.  Designed capacity — 500 units.
  • Rekast JSC (Russia) – manufacturer of paper honeycomb fillers.
  • BOSCO LLC – construction of garment factory.
  • PKF Technakon, LLC (Russia) – manufacturer of electrical products. Construction of a logistics and warehouse complex.

 

B-Park is an up-to-date offer for small and medium business. B-Park is located at the territory of Kaluga South Industrial Park

Advantages:

  • Lease of existing production and storage facilities (BrownFields)
  • Developed utilities infrastructure
  • Built-to-Suit facilities

Tenants:

  • H P Pelzer Rus LLC — the company has been manufacturing sound suppression materials for cars since 2010;
  • Sherdel Kaluga LLC — production of seat frames for cars; in operation since 2010;
  • Toyota Tsusho Rus LLC — organization of logistics processes; opened in 2012.

 

Industrial Park Infrastructure

  • Power supply: The park has two distribution substations: Promzona and Kaluga South.
  • Gas supply: The park has a gas supply pipeline to deliver gas to its investors.
  • Heating: The park provides options for connection to heat supply systems.
  • Water and sanitation: The park has water supply and sewage networks available for use by current residents.
  • The networks are being expanded to accommodate the needs of potential investors.
  • Storm water drainage: Force main drainage system and containment pond built for Volvo Vostok JSC.
  • Drainage system and containment pond for Continental Automotive Systems Rus LLC, Rekast JSC and potential investors complete.
  • Roads:

– 1 km IV category access road from Kaluga-Tula motorway
– 1.7 km motorway No.5 with a traffic circle
– 400 m motorway No.2 for Continental Automotive Systems Rus LLC and Rekast JSC
– Motorways No.3 and No.4.

  • Communications: Telephone communications and high speed Internet throughout the park.
  • Social Infrastructure. European Quarter residential development project implemented in immediate proximity to Kaluga South Industrial Park since 2013. Seven 3-floored and three 5-floored houses built and commissioned. Before 2017, the 18-hectare development project assumes construction of 25 residential buildings with 1140 apartments and social amenities, including a kindergarten, shops and consumer services, an area for active recreation. An express taxi route has been organized to take residents to different districts of Kaluga.

Terms of accommodation

  • compensation-based
  • utilities included in price of lot

About the park in numbers

Total area
105,8 hectares
Vacant for investors
0 hectares
Assigned Industrial Park status
on October 7, 2009

Get
a consultation

We will reply to you within 1 business day